Screed and prep across SE10/SE3
LVT and laminate telegraph every bump in a subfloor. Older Greenwich slabs and modern floating screeds both need a level base — we self-level with latex to 3mm/m² tolerance before any decorative flooring goes down.
What concrete floor levelling in Greenwich actually involves
LVT and laminate telegraph every bump in a subfloor. Older Greenwich slabs and modern floating screeds both need a level base — we self-level with latex to 3mm/m² tolerance before any decorative flooring goes down.
Period properties have suspended timber and lath ceilings below — no aggressive sanding.
- Latex screed for 3–15mm level changes
- Fibre-reinforced screeds for cracked slabs
- Full moisture testing before pour
- Ready for LVT, laminate, vinyl or wood
Before we quote a subfloor prep job in Greenwich
- Stair nosings
Older Greenwich stairs often have shallow treads — we re-cut grippers rather than force a standard kit.
- Doorway transitions
Most georgian and victorian period homes doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.
- Underlay choice
8mm crumb is the usual call for Greenwich bedrooms; 10mm PU on stairs to stop bounce.
“Jordan put in carpets for our 2 bedrooms, landing and stairs in our new loft conversion and in 2 existing bedrooms. The quality of the carpets is excellent and the price for the work very reasonable. He gets on with the job, very professional, work of the highest standard. Top class.” — Gary Simmons, verified Google review
In short — concrete floor levelling in Greenwich from £18/m², latex screed to 3mm/m² tolerance.
Postcodes: SE10/SE3 · Routes: the A2 and Blackwall Tunnel approach · Common build: Georgian and Victorian period homes.
Covering Greenwich Peninsula, West Greenwich, Maze Hill.
Relevant finishes for concrete floor levelling



Concrete Floor Levelling in Greenwich — common questions
Yes — a lot of our screeding is for other fitters and small builders across Greenwich. We hand back a level, dry slab and step out.
Yes — every SE10/SE3 slab gets a hygrometer test before we screed. If moisture is above 75% RH we recommend a DPM before any decorative floor goes down.
Latex screed is walk-on in 3–4 hours, floor-fit ready in 24 hours. Standard timing on every Greenwich Peninsula prep-and-fit we do.
3–15mm typical. Above 15mm we specify fibre-reinforced or a specialist deep-pour screed. Most Greenwich residential slabs are inside the standard range.
