Gravesend kitchen vinyl flooring — fitted properly
A kitchen LVT fit in Gravesend is usually 2 days: day 1 to uplift, screed and let it dry; day 2 to glue and finish. We undercut door frames cleanly and tuck cuts under the kitchen plinth so the room reads finished.
What kitchen lvt in Gravesend actually involves
A kitchen LVT fit in Gravesend is usually 2 days: day 1 to uplift, screed and let it dry; day 2 to glue and finish. We undercut door frames cleanly and tuck cuts under the kitchen plinth so the room reads finished.
Ebbsfleet new-builds come LVT-ready; older terraces almost always need ply over the floorboards.
"Old kitchen vinyl out, screed down, LVT planks the next morning. Couldn't believe how much bigger it looks." — Gravesend customer
- Glue-down LVT — 100% waterproof on the surface
- Plinth-friendly cuts under kitchen units
- Self-levelling screed for flat appliance bases
- Compatible with most underfloor heating
What we check first on a Gravesend lvt job
- Subfloor flatness
LVT shows every bump — victorian terraces subfloors in Gravesend almost always need ply or self-levelling screed first.
- Door undercut
We trim doors on the day so they swing cleanly over glue-down LVT — no scraping, no callbacks.
- Pattern direction
Plank run follows the longest sightline; in narrow Gravesend hallways that means front-door to kitchen.
Recap — kitchen LVT across DA11/DA12 in Karndean, Amtico or trade ranges depending on budget.
Postcodes: DA11/DA12 · Routes: the A2 and M2 · Common build: Victorian terraces.
Covering Ebbsfleet, Northfleet, Singlewell.
Kitchen LVT jobs we've finished nearby



Kitchen LVT in Gravesend — common questions
Yes — quality glue-down LVT is 100% waterproof on the surface. Spills wipe clean, dropped pans don't dent or split.
Yes — standard in Gravesend. We undercut the plinth or cut to the plinth line so the unit doesn't sit on the new floor.
Most kitchen LVT we fit in Gravesend is UFH-rated to ~27°C. We'll confirm the range vs your system at the visit.
Glue cures fully in 24 hours. Light foot traffic from 12 hours, fridge back in after 24, kitchen back in normal use the next morning.
