Greenwich new build flooring — UFH-safe, warranty-safe
The trap on Greenwich new builds is the screed. Developer slabs look flat but often aren't ready for LVT for 6+ weeks. We moisture-test at the visit and hold the fit until it's safe.
What new build flooring in Greenwich actually involves
The trap on Greenwich new builds is the screed. Developer slabs look flat but often aren't ready for LVT for 6+ weeks. We moisture-test at the visit and hold the fit until it's safe.
Period properties have suspended timber and lath ceilings below — no aggressive sanding.
- Fit around developer handover snags — we'll wait for keys
- Underfloor-heating-compatible LVT ranges recommended
- Screed on new slabs where the developer's finish is uneven
- Warranty-safe methods for shared-ownership properties
Before we quote a lvt job in Greenwich
- Subfloor flatness
LVT shows every bump — georgian and victorian period homes subfloors in Greenwich almost always need ply or self-levelling screed first.
- Door undercut
We trim doors on the day so they swing cleanly over glue-down LVT — no scraping, no callbacks.
- Pattern direction
Plank run follows the longest sightline; in narrow Greenwich hallways that means front-door to kitchen.
"Fitted before we moved in — no scuffs, no drama." — Greenwich new-build customer
Recap — Greenwich new builds: LVT from £45/m², carpet from £22/m², all UFH-checked.
Postcodes: SE10/SE3 · Routes: the A2 and Blackwall Tunnel approach · Common build: Georgian and Victorian period homes.
Covering Greenwich Peninsula, West Greenwich, Maze Hill.
New Build Flooring jobs we've finished nearby



New Build Flooring in Greenwich — common questions
We'd advise fitting kitchen last on LVT — that way you can pull the fridge/oven without lifting planks in the future.
Only the ranges rated for it — max 27°C surface, tog ≤1.5. We only quote UFH-approved LVT for these homes.
Often yes. We use a calcium carbide meter on the visit — if it's over 2% CM we'll recommend waiting or applying a moisture barrier.
Yes — best time. We can go in the day after handover, finish before removals, and the floor gets no scuff marks.
