Old floorboards · Uneven timber · New base for LVT

Blackheath ply overlay fitter — perfect base for LVT

From £22/m² prep supplied & fitted

12mm ply overlay for SE3 timber floors that need extra rigidity — where the joists are wide-spaced or the boards are especially uneven. We spec 6 or 12 on survey.

5-star rated locally·20 minutes from our base·From £22/m² prep
Blackheath subfloor prep — georgian terraces
Plywood Overlay Subfloor Prep · Blackheath

What plywood overlay subfloor prep in Blackheath actually involves

12mm ply overlay for SE3 timber floors that need extra rigidity — where the joists are wide-spaced or the boards are especially uneven. We spec 6 or 12 on survey.

Parquet under carpet is common — always lifted carefully before quoting anything else.

What we check first on a Blackheath subfloor prep job

  • Blackheath subfloor reality

    Parquet under carpet is common — always lifted carefully before quoting anything else.

  • Underlay choice

    8mm crumb is the usual call for Blackheath bedrooms; 10mm PU on stairs to stop bounce.

  • Doorway transitions

    Most georgian terraces doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

Included with every Blackheath job
  • 6mm or 12mm ply overlay for old floorboard subfloors
  • Ring-shank nailed on 150mm grid — no squeaks
  • Perfect base for LVT, laminate, vinyl and wood
  • Alternative to full screed on suspended floors
Summary

In short — plywood overlay subfloor prep in Blackheath from £22/m², ring-shank nailed for a squeak-free base.

Recent work · Blackheath

"12mm ply on a wide-joist Victorian floor — solid base, LVT reads perfectly." — SE3 architect

Blackheath context

Postcodes: SE3 · Routes: the A2 and Shooters Hill Road · Common build: Georgian terraces.

Covering The Paragon, Cator estate, Vanbrugh Park.

Recent work · near Blackheath

Plywood Overlay Subfloor Prep jobs we've finished nearby

Plywood Overlay Subfloor Prep fitted in Blackheath — Self-levelling screed laid before LVT install
Self-levelling screed laid before LVT install — Blackheath, SE3
Plywood Overlay Subfloor Prep fitted in Blackheath — Hallway underlay being laid pre-carpet
Hallway underlay being laid pre-carpet — Blackheath, SE3
Plywood Overlay Subfloor Prep fitted in Blackheath — Stair runner under a feature chandelier
Stair runner under a feature chandelier — Blackheath, SE3
Blackheath FAQs

Plywood Overlay Subfloor Prep in Blackheath — common questions

6mm or 12mm ply overlay in Blackheath?

6mm for most residential rooms; 12mm where joists are wide or boards are particularly uneven. Standard 6mm on Victorian bedroom fits in The Paragon.

Will overlay stop floor squeaks?

Yes — ring-shank nails on 150mm grid pin the ply and the boards below to the joists. Standard on every SE3 overlay job.

How much height does it add?

6–12mm plus underlay for the new decorative floor — usually 10–20mm total. Doors may need trimming, we factor that in on the Blackheath visit.

Can you lay LVT straight after overlay?

Yes — ply overlay is fit-ready the same day. No moisture cure required (unlike latex screed).

Call WhatsApp Quote