Old floorboards · Uneven timber · New base for LVT

Hayes ply overlay fitter — perfect base for LVT

From £22/m² prep supplied & fitted

Suspended timber floors across Pickhurst Victorian and Edwardian homes get plywood overlay before any decorative floor. It's the alternative to a full screed and often the right answer for a first-floor room.

5-star rated locally·28 minutes from our base·From £22/m² prep supplied & fitted
Recent subfloor prep installation in Hayes (BR2)
Plywood Overlay Subfloor Prep · Hayes

What plywood overlay subfloor prep in Hayes actually involves

Suspended timber floors across Pickhurst Victorian and Edwardian homes get plywood overlay before any decorative floor. It's the alternative to a full screed and often the right answer for a first-floor room.

1930s pine boards throughout — ply overlay standard before LVT.

Verified customer review

“Fantastic & efficient service from the team — quote was back to me really quick, and best value I could find after phoning around and shopping for weeks on end. Highly recommended.” — Sam Lorkins, verified Google review

Included with every Hayes job
  • 6mm or 12mm ply overlay for old floorboard subfloors
  • Ring-shank nailed on 150mm grid — no squeaks
  • Perfect base for LVT, laminate, vinyl and wood
  • Alternative to full screed on suspended floors

Before we quote a subfloor prep job in Hayes

  • Stair nosings

    Older Hayes stairs often have shallow treads — we re-cut grippers rather than force a standard kit.

  • Doorway transitions

    Most 1930s detached homes doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

  • Underlay choice

    8mm crumb is the usual call for Hayes bedrooms; 10mm PU on stairs to stop bounce.

Summary

Bottom line: LVT over old floorboards is a mistake. Ply overlay first, LVT second.

Hayes context

Postcodes: BR2 · Routes: the A232 and Pickhurst Lane · Common build: 1930s detached homes.

Covering Pickhurst, Hayes Common, Keston border.

JT Flooring gallery

Relevant finishes for plywood overlay subfloor prep

Hallway underlay being laid pre-carpet from the JT Flooring project gallery
Hallway underlay being laid pre-carpet — example from the JT Flooring project gallery for Hayes customers
Self-levelling screed laid before LVT install from the JT Flooring project gallery
Self-levelling screed laid before LVT install — example from the JT Flooring project gallery for Hayes customers
Full-room carpet fit with tight seams along the long wall from the JT Flooring project gallery
Full-room carpet fit with tight seams along the long wall — example from the JT Flooring project gallery for Hayes customers
Hayes FAQs

Plywood Overlay Subfloor Prep in Hayes — common questions

Can you lay LVT straight after overlay?

Yes — ply overlay is fit-ready the same day. No moisture cure required (unlike latex screed).

How much height does it add?

6–12mm plus underlay for the new decorative floor — usually 10–20mm total. Doors may need trimming, we factor that in on the Hayes visit.

Will overlay stop floor squeaks?

Yes — ring-shank nails on 150mm grid pin the ply and the boards below to the joists. Standard on every BR2 overlay job.

6mm or 12mm ply overlay in Hayes?

6mm for most residential rooms; 12mm where joists are wide or boards are particularly uneven. Standard 6mm on Victorian bedroom fits in Pickhurst.

Call WhatsApp Quote