Old floorboards · Uneven timber · New base for LVT

Ply overlay subfloors across SE9/BR7

From £22/m² prep supplied & fitted

Suspended timber floors across Fairmount Victorian and Edwardian homes get plywood overlay before any decorative floor. It's the alternative to a full screed and often the right answer for a first-floor room.

5-star rated locally·15 minutes from our base·From £22/m² prep supplied & fitted
Recent subfloor prep installation in Mottingham (SE9/BR7)
Plywood Overlay Subfloor Prep · Mottingham

What plywood overlay subfloor prep in Mottingham actually involves

Suspended timber floors across Fairmount Victorian and Edwardian homes get plywood overlay before any decorative floor. It's the alternative to a full screed and often the right answer for a first-floor room.

Cottage estates often have thin chipboard upstairs — checked for deflection before laying laminate or LVT.

Before we quote a subfloor prep job in Mottingham

  • Stair nosings

    Older Mottingham stairs often have shallow treads — we re-cut grippers rather than force a standard kit.

  • Doorway transitions

    Most 1920s cottage-estate terraces doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

  • Underlay choice

    8mm crumb is the usual call for Mottingham bedrooms; 10mm PU on stairs to stop bounce.

Included with every Mottingham job
  • 6mm or 12mm ply overlay for old floorboard subfloors
  • Ring-shank nailed on 150mm grid — no squeaks
  • Perfect base for LVT, laminate, vinyl and wood
  • Alternative to full screed on suspended floors
Summary

Bottom line: LVT over old floorboards is a mistake. Ply overlay first, LVT second.

Verified customer review

“Jordan is polite and amiable. He gets on with his work without a fuss — truly professional approach from start to finish. Shall definitely use again in the future.” — Kell Ward, verified Google review

Mottingham context

Postcodes: SE9/BR7 · Routes: the A20 · Common build: 1920s cottage-estate terraces.

Covering Fairmount, Grove Park border, Coldharbour.

JT Flooring gallery

Relevant finishes for plywood overlay subfloor prep

Hallway underlay being laid pre-carpet from the JT Flooring project gallery
Hallway underlay being laid pre-carpet — example from the JT Flooring project gallery for Mottingham customers
Self-levelling screed laid before LVT install from the JT Flooring project gallery
Self-levelling screed laid before LVT install — example from the JT Flooring project gallery for Mottingham customers
Full-room carpet fit with tight seams along the long wall from the JT Flooring project gallery
Full-room carpet fit with tight seams along the long wall — example from the JT Flooring project gallery for Mottingham customers
Mottingham FAQs

Plywood Overlay Subfloor Prep in Mottingham — common questions

Can you lay LVT straight after overlay?

Yes — ply overlay is fit-ready the same day. No moisture cure required (unlike latex screed).

How much height does it add?

6–12mm plus underlay for the new decorative floor — usually 10–20mm total. Doors may need trimming, we factor that in on the Mottingham visit.

Will overlay stop floor squeaks?

Yes — ring-shank nails on 150mm grid pin the ply and the boards below to the joists. Standard on every SE9/BR7 overlay job.

6mm or 12mm ply overlay in Mottingham?

6mm for most residential rooms; 12mm where joists are wide or boards are particularly uneven. Standard 6mm on Victorian bedroom fits in Fairmount.

Call WhatsApp Quote