Subfloor prep · LVT-ready surface · Latex screed

Bexley latex screed — LVT-ready subfloor in half a day

Self-levelling screed is the unseen step that makes a Bexley LVT or vinyl floor look flat for 15 years. We lift the old finish, scrape adhesive, prime and pour — half a day on most kitchens.

5-star rated locally·10 minutes from our base·From £15/m² applied
Subfloor Prep fitted in a victorian cottages in Bexley
Self-Levelling Screed · Bexley

What self-levelling screed in Bexley actually involves

Self-levelling screed is the unseen step that makes a Bexley LVT or vinyl floor look flat for 15 years. We lift the old finish, scrape adhesive, prime and pour — half a day on most kitchens.

Victorian cottages often have suspended timber over ventilated voids — careful nailing only.

Included with every Bexley job
  • Latex-based self-levelling screed for LVT and vinyl
  • Most kitchens and hallways screeded in half a day
  • Walkable in 4–6 hours, fittable next morning
  • Old adhesive and tile removed first

Bexley subfloor prep — the details that matter

  • Stair nosings

    Older Bexley stairs often have shallow treads — we re-cut grippers rather than force a standard kit.

  • Doorway transitions

    Most victorian cottages doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

  • Underlay choice

    8mm crumb is the usual call for Bexley bedrooms; 10mm PU on stairs to stop bounce.

Recent work · Bexley

"Lifted old quarry tiles, screeded, fitted Karndean — a full transformation." — DA5 install

Summary

Recap — latex screed across DA5 before kitchen, bathroom and hallway fits.

Bexley context

Postcodes: DA5 · Routes: the A2 and Old Bexley Lane · Common build: Victorian cottages.

Covering Old Bexley, North Cray, Bexley village.

Recent work · near Bexley

Self-Levelling Screed jobs we've finished nearby

Self-Levelling Screed fitted in Bexley — Self-levelling screed laid before LVT install
Self-levelling screed laid before LVT install — Bexley, DA5
Self-Levelling Screed fitted in Bexley — Hallway underlay being laid pre-carpet
Hallway underlay being laid pre-carpet — Bexley, DA5
Self-Levelling Screed fitted in Bexley — Stair runner under a feature chandelier
Stair runner under a feature chandelier — Bexley, DA5
Bexley FAQs

Self-Levelling Screed in Bexley — common questions

What's the difference between latex screed and traditional sand-cement?

Latex sets in hours and pours flat; sand-cement takes days and needs tamping. For LVT in Bexley we almost always use latex.

Can you screed over old tiles in Bexley?

Sometimes — we'd need to prime them with a specific bond primer first. Often easier to lift tiles and screed the bare subfloor.

How long until I can walk on it?

4–6 hours typically. LVT can usually be laid the next morning.

Do all LVT installs need screed in Bexley?

Most victorian cottages kitchens and hallways do. We confirm at the visit — sometimes a plywood overlay is the better call instead.

Call now Free quote