Subfloor prep · LVT-ready surface · Latex screed

Floor screeding across Blackheath SE3

From £15/m² applied supplied & fitted

Self-levelling screed is the unseen step that makes a Blackheath LVT or vinyl floor look flat for 15 years. We lift the old finish, scrape adhesive, prime and pour — half a day on most kitchens.

5-star rated locally·20 minutes from our base·From £15/m² applied
Blackheath subfloor prep — georgian terraces
Self-Levelling Screed · Blackheath

What self-levelling screed in Blackheath actually involves

Self-levelling screed is the unseen step that makes a Blackheath LVT or vinyl floor look flat for 15 years. We lift the old finish, scrape adhesive, prime and pour — half a day on most kitchens.

Parquet under carpet is common — always lifted carefully before quoting anything else.

What we check first on a Blackheath subfloor prep job

  • Blackheath subfloor reality

    Parquet under carpet is common — always lifted carefully before quoting anything else.

  • Underlay choice

    8mm crumb is the usual call for Blackheath bedrooms; 10mm PU on stairs to stop bounce.

  • Doorway transitions

    Most georgian terraces doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

Included with every Blackheath job
  • Latex-based self-levelling screed for LVT and vinyl
  • Most kitchens and hallways screeded in half a day
  • Walkable in 4–6 hours, fittable next morning
  • Old adhesive and tile removed first
Summary

Recap — latex screed across SE3 before kitchen, bathroom and hallway fits.

Recent work · Blackheath

"Lifted old quarry tiles, screeded, fitted Karndean — a full transformation." — SE3 install

Blackheath context

Postcodes: SE3 · Routes: the A2 and Shooters Hill Road · Common build: Georgian terraces.

Covering The Paragon, Cator estate, Vanbrugh Park.

Recent work · near Blackheath

Self-Levelling Screed jobs we've finished nearby

Self-Levelling Screed fitted in Blackheath — Self-levelling screed laid before LVT install
Self-levelling screed laid before LVT install — Blackheath, SE3
Self-Levelling Screed fitted in Blackheath — Hallway underlay being laid pre-carpet
Hallway underlay being laid pre-carpet — Blackheath, SE3
Self-Levelling Screed fitted in Blackheath — Stair runner under a feature chandelier
Stair runner under a feature chandelier — Blackheath, SE3
Blackheath FAQs

Self-Levelling Screed in Blackheath — common questions

What's the difference between latex screed and traditional sand-cement?

Latex sets in hours and pours flat; sand-cement takes days and needs tamping. For LVT in Blackheath we almost always use latex.

Can you screed over old tiles in Blackheath?

Sometimes — we'd need to prime them with a specific bond primer first. Often easier to lift tiles and screed the bare subfloor.

How long until I can walk on it?

4–6 hours typically. LVT can usually be laid the next morning.

Do all LVT installs need screed in Blackheath?

Most georgian terraces kitchens and hallways do. We confirm at the visit — sometimes a plywood overlay is the better call instead.

Call WhatsApp Quote