Hither Green floor levelling — latex screed for a perfect base
A Corbett estate extension slab with a 15mm fall from door to skirting isn't a hard job — one pour of fibre-reinforced screed brings it flat overnight. Standard prep before we fit LVT the next day.
What concrete floor levelling in Hither Green actually involves
A Corbett estate extension slab with a 15mm fall from door to skirting isn't a hard job — one pour of fibre-reinforced screed brings it flat overnight. Standard prep before we fit LVT the next day.
Corbett estate has original pine boards throughout — plywood overlay before LVT is standard.
- Latex screed for 3–15mm level changes
- Fibre-reinforced screeds for cracked slabs
- Full moisture testing before pour
- Ready for LVT, laminate, vinyl or wood
Three things that decide a subfloor prep fit in Hither Green
- Hither Green subfloor reality
Corbett estate has original pine boards throughout — plywood overlay before LVT is standard.
- Underlay choice
8mm crumb is the usual call for Hither Green bedrooms; 10mm PU on stairs to stop bounce.
- Doorway transitions
Most corbett estate victorian terraces doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.
"Prep-only screed handover — the other fitter said it was the flattest base he'd worked on this year." — SE13 trade
In short — concrete floor levelling in Hither Green from £18/m², latex screed to 3mm/m² tolerance.
Postcodes: SE13 · Routes: the South Circular and A21 · Common build: Corbett estate Victorian terraces.
Covering Corbett estate, Staplehurst, Manor Lane.
Concrete Floor Levelling jobs we've finished nearby



Concrete Floor Levelling in Hither Green — common questions
3–15mm typical. Above 15mm we specify fibre-reinforced or a specialist deep-pour screed. Most Hither Green residential slabs are inside the standard range.
Latex screed is walk-on in 3–4 hours, floor-fit ready in 24 hours. Standard timing on every Corbett estate prep-and-fit we do.
Yes — every SE13 slab gets a hygrometer test before we screed. If moisture is above 75% RH we recommend a DPM before any decorative floor goes down.
Yes — a lot of our screeding is for other fitters and small builders across Hither Green. We hand back a level, dry slab and step out.
