Screed and prep across SE12/SE13
Prep-only levelling for other fitters and builders across SE12/SE13 — we screed, moisture-test and hand back a level, dry slab ready for whatever floor they're laying.
What concrete floor levelling in Lee actually involves
Prep-only levelling for other fitters and builders across SE12/SE13 — we screed, moisture-test and hand back a level, dry slab ready for whatever floor they're laying.
Victorian terraces often have suspended timber over ventilated voids — careful nailing only.
- Latex screed for 3–15mm level changes
- Fibre-reinforced screeds for cracked slabs
- Full moisture testing before pour
- Ready for LVT, laminate, vinyl or wood
Three things that decide a subfloor prep fit in Lee
- Lee subfloor reality
Victorian terraces often have suspended timber over ventilated voids — careful nailing only.
- Underlay choice
8mm crumb is the usual call for Lee bedrooms; 10mm PU on stairs to stop bounce.
- Doorway transitions
Most victorian terraces doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.
"Prep-only screed handover — the other fitter said it was the flattest base he'd worked on this year." — SE12/SE13 trade
Bottom line: no decorative floor hides an unlevel slab. Level first, fit second.
Postcodes: SE12/SE13 · Routes: the South Circular (A205) · Common build: Victorian terraces.
Covering Manor Park, Old Road, Burnt Ash Hill.
Concrete Floor Levelling jobs we've finished nearby



Concrete Floor Levelling in Lee — common questions
3–15mm typical. Above 15mm we specify fibre-reinforced or a specialist deep-pour screed. Most Lee residential slabs are inside the standard range.
Latex screed is walk-on in 3–4 hours, floor-fit ready in 24 hours. Standard timing on every Manor Park prep-and-fit we do.
Yes — every SE12/SE13 slab gets a hygrometer test before we screed. If moisture is above 75% RH we recommend a DPM before any decorative floor goes down.
Yes — a lot of our screeding is for other fitters and small builders across Lee. We hand back a level, dry slab and step out.
