Latex screed · Self-levelling · Prep-only

Kidbrooke floor levelling — latex screed for a perfect base

From £18/m² prep supplied & fitted

A Kidbrooke Village extension slab with a 15mm fall from door to skirting isn't a hard job — one pour of fibre-reinforced screed brings it flat overnight. Standard prep before we fit LVT the next day.

5-star rated locally·22 minutes from our base·From £18/m² prep
Close-up of fitted subfloor prep in Kidbrooke
Concrete Floor Levelling · Kidbrooke

What concrete floor levelling in Kidbrooke actually involves

A Kidbrooke Village extension slab with a 15mm fall from door to skirting isn't a hard job — one pour of fibre-reinforced screed brings it flat overnight. Standard prep before we fit LVT the next day.

New-build screed is LVT-ready; 1930s semis need ply over the pine boards.

Included with every Kidbrooke job
  • Latex screed for 3–15mm level changes
  • Fibre-reinforced screeds for cracked slabs
  • Full moisture testing before pour
  • Ready for LVT, laminate, vinyl or wood

Before we quote a subfloor prep job in Kidbrooke

  • Kidbrooke subfloor reality

    New-build screed is LVT-ready; 1930s semis need ply over the pine boards.

  • Underlay choice

    8mm crumb is the usual call for Kidbrooke bedrooms; 10mm PU on stairs to stop bounce.

  • Doorway transitions

    Most berkeley homes new-builds doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

Recent work · Kidbrooke

"Prep-only screed handover — the other fitter said it was the flattest base he'd worked on this year." — SE3 trade

Summary

Bottom line: no decorative floor hides an unlevel slab. Level first, fit second.

Kidbrooke context

Postcodes: SE3 · Routes: the A2 and Rochester Way · Common build: Berkeley Homes new-builds.

Covering Kidbrooke Village, Ferrier estate footprint, Weigall Road.

Recent work · near Kidbrooke

Concrete Floor Levelling jobs we've finished nearby

Concrete Floor Levelling fitted in Kidbrooke — Hallway underlay being laid pre-carpet
Hallway underlay being laid pre-carpet — Kidbrooke, SE3
Concrete Floor Levelling fitted in Kidbrooke — Self-levelling screed laid before LVT install
Self-levelling screed laid before LVT install — Kidbrooke, SE3
Concrete Floor Levelling fitted in Kidbrooke — LVT plank fit across a kitchen floor
LVT plank fit across a kitchen floor — Kidbrooke, SE3
Kidbrooke FAQs

Concrete Floor Levelling in Kidbrooke — common questions

Prep only, no decorative floor?

Yes — a lot of our screeding is for other fitters and small builders across Kidbrooke. We hand back a level, dry slab and step out.

Do you moisture-test the slab first?

Yes — every SE3 slab gets a hygrometer test before we screed. If moisture is above 75% RH we recommend a DPM before any decorative floor goes down.

How long before we can fit the decorative floor?

Latex screed is walk-on in 3–4 hours, floor-fit ready in 24 hours. Standard timing on every Kidbrooke Village prep-and-fit we do.

How thick can latex screed go?

3–15mm typical. Above 15mm we specify fibre-reinforced or a specialist deep-pour screed. Most Kidbrooke residential slabs are inside the standard range.

Call WhatsApp Quote