Self-levelling · Fast-cure · Trade & retail

Sidcup latex screed — fast-cure, walk-on in hours

From £16/m² prep supplied & fitted

Trade fitters across DA14/DA15 book us prep-only for the screed and DPM stage — same-day survey, next-day pour, ready for their fit 24 hours after that.

5-star rated locally·5–10 minutes from our base·From £16/m² prep supplied & fitted
Recent subfloor prep installation in Sidcup (DA14/DA15)
Latex Screed Fitting · Sidcup

What latex screed fitting in Sidcup actually involves

Trade fitters across DA14/DA15 book us prep-only for the screed and DPM stage — same-day survey, next-day pour, ready for their fit 24 hours after that.

1930s pine boards over joists — usually need a 6mm ply overlay before LVT or vinyl.

Verified customer review

“Always so helpful and professional, carpets are good quality and stay looking nice even with a family and a dog. Would highly recommend.” — Katie Rial, verified Google review

Included with every Sidcup job
  • Fast-cure latex screed for tight programme schedules
  • Two-part fibre screed for high-traffic slabs
  • Handover moisture certificate for other fitters
  • Priming and DPM included where required

Three things that decide a subfloor prep fit in Sidcup

  • Sidcup subfloor reality

    1930s pine boards over joists — usually need a 6mm ply overlay before LVT or vinyl.

  • Underlay choice

    8mm crumb is the usual call for Sidcup bedrooms; 10mm PU on stairs to stop bounce.

  • Doorway transitions

    Most 1930s bay-fronted semis doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

Summary

Bottom line: fast-cure latex saves a day on any programme.

Sidcup context

Postcodes: DA14/DA15 · Routes: the A20 · Common build: 1930s bay-fronted semis.

Covering Sidcup Hill, Halfway Street, New Eltham border.

JT Flooring gallery

Relevant finishes for latex screed fitting

Self-levelling screed laid before LVT install from the JT Flooring project gallery
Self-levelling screed laid before LVT install — example from the JT Flooring project gallery for Sidcup customers
Hallway underlay being laid pre-carpet from the JT Flooring project gallery
Hallway underlay being laid pre-carpet — example from the JT Flooring project gallery for Sidcup customers
Tile-effect vinyl fitted around a bathroom suite from the JT Flooring project gallery
Tile-effect vinyl fitted around a bathroom suite — example from the JT Flooring project gallery for Sidcup customers
Sidcup FAQs

Latex Screed Fitting in Sidcup — common questions

How is latex screed different to sand-cement?

Sand-cement takes days to cure; latex takes hours. For a Sidcup retail refit or a home renovation on a schedule, latex is the only realistic option.

Do you supply the DPM as well?

Yes — where the moisture test shows above 75% RH we install a liquid DPM before the screed. Standard on Sidcup Hill ground-floor slabs.

Can other fitters lay directly onto your screed?

Yes — we hand over a level, primed, dry surface with a moisture certificate. Standard prep handover for DA14/DA15 trade.

How long can I leave a latex screed before fitting?

Weeks — the screed is stable once cured. We routinely screed a Sidcup slab and come back for the fit 5–10 days later without any surface prep.

Call WhatsApp Quote