Victorian · Edwardian · Period property

Period floorboard overlay across SE28

From £20/m² prep supplied & fitted

1970s Peabody-era estates transitioning to mid-rise new-builds 1970s peabody estates floorboards in Thamesmead were never designed to hold LVT — the boards are too narrow, too gappy, too uneven. We spec ply, hardboard or latex prep depending on board condition and what's going on top.

5-star rated locally·25 minutes from our base·From £20/m² prep supplied & fitted
Thamesmead subfloor prep — 1970s peabody estates
Cover Old Floorboards · Thamesmead

What cover old floorboards in Thamesmead actually involves

1970s Peabody-era estates transitioning to mid-rise new-builds 1970s peabody estates floorboards in Thamesmead were never designed to hold LVT — the boards are too narrow, too gappy, too uneven. We spec ply, hardboard or latex prep depending on board condition and what's going on top.

Original 70s screed is often uneven — self-levelling latex is almost always needed for LVT.

Included with every Thamesmead job
  • Ply, hardboard or latex prep depending on board condition
  • Fixes squeaks, gaps and unevenness
  • Ready for LVT, laminate, vinyl or carpet
  • Suits Victorian, Edwardian and inter-war floorboards

What we check first on a Thamesmead subfloor prep job

  • Stair nosings

    Older Thamesmead stairs often have shallow treads — we re-cut grippers rather than force a standard kit.

  • Doorway transitions

    Most 1970s peabody estates doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

  • Underlay choice

    8mm crumb is the usual call for Thamesmead bedrooms; 10mm PU on stairs to stop bounce.

Verified customer review

“Lovely carpet fitted by Jordan, really good service, definitely will be using again.” — Louise Bowyer, verified Google review

Summary

In short — cover old floorboards in Thamesmead from £20/m² prep, spec'd to the decorative floor above.

Thamesmead context

Postcodes: SE28 · Routes: the A2016 (Bronze Age Way) · Common build: 1970s Peabody estates.

Covering Southmere, West Thamesmead, Binsey Walk.

JT Flooring gallery

Relevant finishes for cover old floorboards

Self-levelling screed laid before LVT install from the JT Flooring project gallery
Self-levelling screed laid before LVT install — example from the JT Flooring project gallery for Thamesmead customers
Hallway underlay being laid pre-carpet from the JT Flooring project gallery
Hallway underlay being laid pre-carpet — example from the JT Flooring project gallery for Thamesmead customers
Grey twist-pile carpet across a large open-plan room from the JT Flooring project gallery
Grey twist-pile carpet across a large open-plan room — example from the JT Flooring project gallery for Thamesmead customers
Thamesmead FAQs

Cover Old Floorboards in Thamesmead — common questions

Can you keep the original boards visible in one room?

Absolutely — a lot of 1970s Peabody-era estates transitioning to mid-rise new-builds customers in Thamesmead keep original boards in a sitting room and overlay the halls and kitchen. We coordinate the transition.

What about height at doors?

6mm overlay plus 4mm LVT plus 1mm underlay = 11mm rise. Interior doors often need trimming. We handle it as part of the SE28 prep.

Can you overlay without lifting the boards?

Yes — that's the whole point. We fix loose boards, screw where the boards are moving, then overlay on top. Skirting stays in place on most Southmere fits.

Do I really need to cover the boards for carpet?

Usually just a heavy underlay is enough for carpet in Thamesmead period rooms — the underlay bridges gaps. LVT, laminate and vinyl all need proper ply or hardboard overlay.

Call WhatsApp Quote