Latex screed · Self-levelling · Prep-only

Screed and prep across SE2

From £18/m² prep supplied & fitted

LVT and laminate telegraph every bump in a subfloor. Older Abbey Wood slabs and modern floating screeds both need a level base — we self-level with latex to 3mm/m² tolerance before any decorative flooring goes down.

5-star rated locally·22 minutes from our base·From £18/m² prep supplied & fitted
Abbey Wood subfloor prep — post-2018 new-build apartments
Concrete Floor Levelling · Abbey Wood

What concrete floor levelling in Abbey Wood actually involves

LVT and laminate telegraph every bump in a subfloor. Older Abbey Wood slabs and modern floating screeds both need a level base — we self-level with latex to 3mm/m² tolerance before any decorative flooring goes down.

New-build screed slabs are LVT-ready straight from the developer; council-era boards need ply.

What we check first on a Abbey Wood subfloor prep job

  • Stair nosings

    Older Abbey Wood stairs often have shallow treads — we re-cut grippers rather than force a standard kit.

  • Doorway transitions

    Most post-2018 new-build apartments doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

  • Underlay choice

    8mm crumb is the usual call for Abbey Wood bedrooms; 10mm PU on stairs to stop bounce.

Included with every Abbey Wood job
  • Latex screed for 3–15mm level changes
  • Fibre-reinforced screeds for cracked slabs
  • Full moisture testing before pour
  • Ready for LVT, laminate, vinyl or wood
Summary

Bottom line: no decorative floor hides an unlevel slab. Level first, fit second.

Verified customer review

“Jordan was so helpful and fit in to our dates. Even though we didn't know what they would be. Nothing was too much trouble. Will definitely recommend to anyone. Thank you.” — Georgina Bozza, verified Google review

Abbey Wood context

Postcodes: SE2 · Routes: the Elizabeth line corridor · Common build: post-2018 new-build apartments.

Covering Southmere, Lesnes Abbey, Bostall.

JT Flooring gallery

Relevant finishes for concrete floor levelling

Self-levelling screed laid before LVT install from the JT Flooring project gallery
Self-levelling screed laid before LVT install — example from the JT Flooring project gallery for Abbey Wood customers
Hallway underlay being laid pre-carpet from the JT Flooring project gallery
Hallway underlay being laid pre-carpet — example from the JT Flooring project gallery for Abbey Wood customers
Marble-effect floor in a contemporary bathroom from the JT Flooring project gallery
Marble-effect floor in a contemporary bathroom — example from the JT Flooring project gallery for Abbey Wood customers
Abbey Wood FAQs

Concrete Floor Levelling in Abbey Wood — common questions

How thick can latex screed go?

3–15mm typical. Above 15mm we specify fibre-reinforced or a specialist deep-pour screed. Most Abbey Wood residential slabs are inside the standard range.

How long before we can fit the decorative floor?

Latex screed is walk-on in 3–4 hours, floor-fit ready in 24 hours. Standard timing on every Southmere prep-and-fit we do.

Do you moisture-test the slab first?

Yes — every SE2 slab gets a hygrometer test before we screed. If moisture is above 75% RH we recommend a DPM before any decorative floor goes down.

Prep only, no decorative floor?

Yes — a lot of our screeding is for other fitters and small builders across Abbey Wood. We hand back a level, dry slab and step out.

Call WhatsApp Quote