Subfloor prep · LVT-ready surface · Latex screed

Self-levelling screed in Thamesmead

From £15/m² applied supplied & fitted

LVT shows every bump in the subfloor. In Thamesmead 1970s peabody estates we almost always screed kitchens and hallways before laying LVT — latex-based, walkable in 4–6 hours, fittable the next morning.

5-star rated locally·25 minutes from our base·From £15/m² applied
Thamesmead subfloor prep — 1970s peabody estates
Self-Levelling Screed · Thamesmead

What self-levelling screed in Thamesmead actually involves

LVT shows every bump in the subfloor. In Thamesmead 1970s peabody estates we almost always screed kitchens and hallways before laying LVT — latex-based, walkable in 4–6 hours, fittable the next morning.

Original 70s screed is often uneven — self-levelling latex is almost always needed for LVT.

What we check first on a Thamesmead subfloor prep job

  • Stair nosings

    Older Thamesmead stairs often have shallow treads — we re-cut grippers rather than force a standard kit.

  • Doorway transitions

    Most 1970s peabody estates doorways here need a bevelled bar rather than a Z-bar to clear the carpet next door.

  • Underlay choice

    8mm crumb is the usual call for Thamesmead bedrooms; 10mm PU on stairs to stop bounce.

Included with every Thamesmead job
  • Latex-based self-levelling screed for LVT and vinyl
  • Most kitchens and hallways screeded in half a day
  • Walkable in 4–6 hours, fittable next morning
  • Old adhesive and tile removed first
Summary

In short — self-levelling screed in Thamesmead from £15/m² applied, walkable in hours, LVT-ready next day.

Recent work · Thamesmead

"Lifted old quarry tiles, screeded, fitted Karndean — a full transformation." — SE28 install

Thamesmead context

Postcodes: SE28 · Routes: the A2016 (Bronze Age Way) · Common build: 1970s Peabody estates.

Covering Southmere, West Thamesmead, Binsey Walk.

Recent work · near Thamesmead

Self-Levelling Screed jobs we've finished nearby

Self-Levelling Screed fitted in Thamesmead — Self-levelling screed laid before LVT install
Self-levelling screed laid before LVT install — Thamesmead, SE28
Self-Levelling Screed fitted in Thamesmead — Hallway underlay being laid pre-carpet
Hallway underlay being laid pre-carpet — Thamesmead, SE28
Self-Levelling Screed fitted in Thamesmead — Grey twist-pile carpet across a large open-plan room
Grey twist-pile carpet across a large open-plan room — Thamesmead, SE28
Thamesmead FAQs

Self-Levelling Screed in Thamesmead — common questions

What's the difference between latex screed and traditional sand-cement?

Latex sets in hours and pours flat; sand-cement takes days and needs tamping. For LVT in Thamesmead we almost always use latex.

Can you screed over old tiles in Thamesmead?

Sometimes — we'd need to prime them with a specific bond primer first. Often easier to lift tiles and screed the bare subfloor.

How long until I can walk on it?

4–6 hours typically. LVT can usually be laid the next morning.

Do all LVT installs need screed in Thamesmead?

Most 1970s peabody estates kitchens and hallways do. We confirm at the visit — sometimes a plywood overlay is the better call instead.

Call WhatsApp Quote